Ukrainian Defense Forces Strike Michurinskaya Thermal Power Plant in Belgorod

Ukrainian Defense Forces Strike Michurinskaya Thermal Power Plant in Belgorod
The moment of the attack on the Michurinskaya CHP in Belgorod on January 20, 2025. Photo: Pepel. Belgorod

On the night of January 20, the Ukrainian Defense Forces executed a missile strike on the Michurinskaya gas-turbine combined heat and power plant, operated by GT Energo, in Belgorod.

Belgorod Region Governor Vyacheslav Gladkov confirmed the attack via his Telegram channel. He said the strike damaged facilities belonging to the region’s energy infrastructure.

“As a result of the shelling, enterprises that are part of the regional energy sector were damaged. We are conducting demining operations and starting emergency repair work. In addition, buildings and equipment at one of the enterprises in Belgorod were damaged,” Gladkov wrote.

The strike involved the use of missiles. According to Russian monitoring sources, approximately 25 missiles were launched toward Belgorod.

According to information on the GT Energo company’s website, the Michurinskaya Thermal Power Plant has an electrical capacity of 24.2 MW and a thermal capacity of 80 Gcal/hour.

The plant primarily supplies energy to the production facilities and administrative buildings of the Belenergomash–BZEM plant and is not part of the city’s district heating system.

The targeted power plant is about half the capacity of the previously attacked Luch Thermal Power Plant and the Belgorod Thermal Power Plant.

Share this post:

SUPPORT MILITARNYI

PrivatBank ( Bank card )
5169 3351 0164 7408
Bank Account in UAH (IBAN)
UA043052990000026007015028783
BTC
bc1qg0z99m95fte7kj8faa7h2kvnq92wvc53exe8gm
USDT
0x8676644fA7B6d328310283cAC1065Ae01d97CEe7
ETH
0xfD02863D3289416fcF50975c9DFda13623f97758
Popular
Button Text